Use case
environmental and land use

Building permit data for environmental and land use research

A building permit records a single proposed change to one parcel: what is being built, demolished or altered, its declared valuation, and the date the jurisdiction issued it. That gives researchers an account of the built environment as it changes, months or years before the change shows up in a decennial census, an assessor's roll or a land cover classification. Because permits are filed with the local authority rather than reported by the owner, they catch small additions, alterations and demolitions that parcel snapshots miss. The limitation is that a permit is a statement of intent: not every issued permit becomes a finished building, and unpermitted work is invisible by construction.

How environmental and land use researchers use building permit data

Measuring neighbourhood change as it happens

Permit records give a dated, parcel located account of investment in the built environment, so researchers can construct monthly or annual measures of construction, demolition and renovation for small areas and use them as outcomes or as controls in work on land use change, displacement and environmental exposure. The usual design aggregates permits to a block group, tract or grid cell and reads the resulting series against a policy change, a rezoning or an administrative boundary. The measure is one of permitted activity rather than completed work, and jurisdictions differ in what triggers a permit at all, so the reporting thresholds need checking before counts from different authorities are pooled.

Datasets
Construction Monitor, ATTOM
Used in
Daniel T. O’Brien, Barrett Montgomery, Justin De Benedictis-Kessner, Saina Sheini, 2019

Development on hazard exposed and ecologically sensitive land

Joining issued permits to hazard layers or protected area boundaries lets researchers ask whether new construction is still being sited in floodplains, wildfire interface zones or habitat, and whether the pattern shifts after a disaster, a map revision or a change in insurance availability. The unit is the permitted project, which is what makes the question tractable: exposure is measured at the location of the new structure rather than averaged over a whole jurisdiction. A permit records what an authority approved and not what environmental review it received, so any claim about assessment being skipped has to bring the review record in separately.

Datasets
Construction Monitor, ClimateCheck
Used in
Muséum National D'Histoire Naturelle, PatriNat, Julien Siracusa, B. Padilla, 2026

Permitting time as regulatory friction

The interval between application and issuance is itself the variable in work on how permitting regimes shape the cost, timing and siting of building, including projects that trigger environmental review. Researchers typically model approval time against project type, declared valuation and issuing authority, comparing across authorities or across a reform date. Only permits that were eventually granted appear in the record, so applications withdrawn or refused after long delays drop out and the estimated delay is a lower bound.

Datasets
Construction Monitor
Used in
Ivan César Ribeiro, 2023

Building permit datasets available on Dewey

Construction Monitor

Commercial

United States building permit records, the base panel for measuring where and when construction, alteration and demolition are actually being approved.

View dataset

ATTOM

Commercial

Parcel level residential property records that let a permit be attached to the property it modifies, so construction activity can be read against property characteristics rather than counted on its own.

View dataset

ClimateCheck

Commercial

Property level climate risk assessments, which let new construction be sorted by the hazard exposure of the land it is going up on rather than by jurisdiction alone.

View dataset

Interested in a quick platform demo?